Find the incorrect statement.
A. Event and node are synonyms
B. An event is represented by a circle
C. An activity is shown by a square
D. A dummy activity is critical when its earliest start time (est) and latest finish time (lft) are the same
Which of the following were used to develop network techniques?
A. Milestone chart only
B. Bar chart only
C. Both the milestone chart and bar chart
D. Critical path method
Expand C.O.P.A.C.
A. Critical operating production allocation control
B. Common operating production allocation control
C. Combine operating production allocation control
D. Co-operating production allocation control
What is the acronym for G.E.R.T.?
A. Geometrical evaluation and review technique
B. Geometrical evaluation and review technology
C. Graphical evaluation and review technique
D. Graphical evaluation and review technology
What is a dummy activity?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project
What is an event?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project
What is an activity?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project
What is a critical activity?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project