Civil Engineering MCQs

2965 MCQs  (Page 176 of 297)

At a work site, statistical quality control of concrete means________________?
A. Measurement of risks to eliminate failures
B. Applying the theory’ of probability to sample testing or inspection
C. Reduction in wastage of inspection costs
D. Reduction in costs for the removal of defects
In the bar chart planning____________?
A. Consider the following statements?
B. 1. interdependence of the operations cannot be portrayed
C. 2. progress of work can be measured
D. 3. spare time of the activities can be determined