Civil Engineering MCQs

2965 MCQs  (Page 174 of 297)

PERT is preferred for planning because of________________?
ConSider the following features/factors
D. None of these
The correct sequence of these operations in tunnel construction is______________?
A. Consider the following operations :
B. 1. drilling
C. 2. blasting
D. 3. mucking
Batching refers to________________?
A. Controlling the total quantity at each batch
B. Weighing accurately, the quantity of each material for a job before mixing
C. Controlling the quantity of each material into each batch
D. Adjusting the water to be added in each batch according to the mositure content of the materials being mixed in the batch
Sensitivity analysis is a study of__________________?
A. Comparison of profit and loss
B. Comparison of assets and liabilities
C. Change in output due to change in input
D. Economics of cost and benefits of the project