PPSC Past Papers MCQs
PPSC Past Papers Most Repeated — 741 MCQs
(Page 57 of 75)
Practice PPSC Past Papers MCQs
with solved questions from real past exams. These MCQs cover
PPSC Past Papers Most Repeated past papers
and are ideal for candidates preparing for competitive exams.
What LTM corresponds to?
A. Activation state of network
B. Encoded pattern information pattern in synaptic weights
C. Either way
D. Both way
Expand C.O.P.A.C.
A. Critical operating production allocation control
B. Common operating production allocation control
C. Combine operating production allocation control
D. Co-operating production allocation control
What is the acronym for G.E.R.T.?
A. Geometrical evaluation and review technique
B. Geometrical evaluation and review technology
C. Graphical evaluation and review technique
D. Graphical evaluation and review technology
What is a dummy activity?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project
What is an event?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project
What is an activity?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project
What is a critical activity?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project