Industrial Management
Network Analysis Set 2
Q
Identify a dummy activity in the below-shown network diagram.
AA. Activity 1
BB. Activity 6
CC. Activity 8
DD. Activity 2
Correct Answer:
B. B. Activity 6
Explanation:
Since activity 6 is represented by an arrow with a dotted line, it is a dummy activity. A dummy activity may be critical or non-critical. In the given network diagram, the dummy activity is non-critical.