Civil Engineering MCQs

2965 MCQs  (Page 204 of 297)

While preparing a detailed estimate__________________?
A. Dimension should be measured correct to 0.01 m
B. Area should be measured correct to 0.01 sqm
C. Volume should be measured correct to 0.01 cum
D. All the above
The most reliable estimate is_________________?
A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate
According to ISI method of measurement, the order of the sequence is_________________?
A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these
The item of the brick structure measured in sq.m, is___________________?
A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches
Anti-siphonage pipe is connected to__________________?
A. Main soil pipe
B. Bottom of p trap w.c.
C. Top of p trap w.c.
D. Side of water closet