The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
A. Earth work in excavation
B. Rock cutting
C. Excavation in trenches for foundation
D. All the above
Pick up the correct statement regarding the centre line method of estimating a building?
A. Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item
B. The centre line is worked out separately for different sections of walls of a building
C. The centre line length is reduced by half the layer of main wall joining the partition wall
D. All the above
The following item of earth work is not measured separately ?
A. Setting out of works
B. Site clearance
C. Steps in deep excavation
D. All the above
The area of the cross-section of a road fully in banking shown in the given figure, is________________?
A. [sb² + r² (2bd + sd)²]/(r² – s²)
B. [sb² + r² (2bd + sd)²]/(r² – s5)
C. [sb² + r² (2bd + sd)²]/(r – s)
D. None of these
The measurement is made in square metre in case of_________________?
A. Cement concrete in foundation
B. R.c.c. structure
C. Hollow concrete block wall
D. None of these
For the construction of buildings, the subheads of the estimate are________________?
A. Earthwork, concrete work, brick work
B. Brickwork, stone work, roofing
C. Brickwork flooring, wood work, steel work
D. All the above