Civil Engineering MCQs

2965 MCQs  (Page 205 of 297)

The measurement is made for stone work in square metre in case of________________?
A. Wall facing
B. Columns, lintels, copings
C. Building work
D. A. and d. of the above
Carpet area does not include the area of_________________?
A. The walls along with doors and other openings
B. Bath room and lavatory
C. Kitchen and pantry
D. All the above
In case of laying gullies, siphons, intercepting traps, the cost includes_______________?
A. Setting and laying
B. Bed concreting
C. Connection to drains
D. All of these
The inspection pit or chamber is a manhole provided in a base drainage system________________?
A. At every change of direction
B. At every change of gradient
C. At every 30 m intervals
D. All the above
The ‘centre line method’ is specially adopted for estimating_________________?
A. Circular buildings
B. Hexagonal buildings
C. Octagonal buildings
D. All the above
The order of booking dimensions is________________?
A. Length, breadth, height
B. Breadth, length, height
C. Height, breadth, length
D. None of these
The correct Prismoidal formula for volume is________________?
A. D [first area + last area + even area + 2 odd areas]
B. D/3 [first area + last area + 4 even area + 2 odd areas]
C. D/3 [first area + last area + 2 even area + 4 odd areas]
D. D/6 [first area + odd areas]
Pick up the correct statement from the following?
A. The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies
B. Additional supervising staff engaged at work site, is called work charged establishment
C. Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item
D. All the above