What is an activity?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project
What is an event?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project
What is a dummy activity?
A. A specific instant of time which marks the start and the end of an activity
B. It is an element of the project and has a specific time duration
C. It is a dotted line connecting the two head events and consumes no time
D. An activity which if consumes more time than the estimated time that results in the delay of the entire project
What is the acronym for G.E.R.T.?
A. Geometrical evaluation and review technique
B. Geometrical evaluation and review technology
C. Graphical evaluation and review technique
D. Graphical evaluation and review technology
Expand C.O.P.A.C.
A. Critical operating production allocation control
B. Common operating production allocation control
C. Combine operating production allocation control
D. Co-operating production allocation control
Which of the following were used to develop network techniques?
A. Milestone chart only
B. Bar chart only
C. Both the milestone chart and bar chart
D. Critical path method
What LTM corresponds to?
A. Activation state of network
B. Encoded pattern information pattern in synaptic weights
C. Either way
D. Both way
What does STM corresponds to?
A. Activation state of network
B. Encoded pattern information pattern in synaptic weights
C. Either way
D. Both way