Mechanical Engineering MCQs

2075 MCQs  (Page 206 of 208)

In A-B-C control policy, maximum attention is given to__________________?
A. Those items which consume money
B. Those items which are not readily available
C. Those x items which are in more demand
D. Those items which consume more money
The two-bin system is concerned with_________________?
A. Ordering procedure
B. Forecasting sales
C. Production planning
D. Despatching and expediting
Replacement studies are made on the fol-lowing basis_________________?
A. annual cost method
B. rate of return method
C. total life average method
D. present worth method
Bin card is used in__________________?
A. Administrative wing
B. Workshop
C. Foundry shop
D. Stores
PERT and CPM are__________________?
A. techniques to determine project status
B. decision making techniques
C. charts which increase aesthetic appearance of rooms
D. aids to determine cost implications of project
CPM is the___________________?
A. Time oriented technique
B. Event oriented technique
C. Activity oriented technique
D. Target oriented technique
Work study comprises following main techniques_________________?
A. Method study and work measurement
B. Method study and time study
C. Time study and work measurement
D. Method study and job evaluation
PERT is the__________________?
A. Time oriented technique
B. Event oriented technique
C. Activity oriented technique
D. Target oriented technique