O on a PERT/CPM chart represents____________________?
A. An ordinary event
B. A significant event representing some mile-stone
C. An event to be transferred to other network chart
D. Dangling event
PERT analysis is based on____________________?
A. Optimistic time
B. Pessimistic time
C. Most likely time
D. All of the above
A CPM family includes____________________?
A. cpa (critical path analysis)
B. cpp (critical path plotted)
C. mce (minimum cost expenditure)
D. cps (critical path scheduling)
PERT is___________________?
A. an analytic tool in concept
B. limit up of event oriented diagrams
C. used for research and development projects
D. based on three time estimates for activities linking up two events
The technique for establishing and maintaining priorities among the various jobs of any project is known as___________________?
A. Event flow scheduling technique
B. Critical ratio scheduling
C. Slotting technique for scheduling
D. Short interval scheduling
One horsepower is equal to_________________?
A. 102 watts
B. 75 watts
C. 550 watts
D. 736 watts
The patrol is distilled at a temperature from :
A. 6° to 20°
B. 220° to 345°
C. 65° to 220°
D. 15° to 120°