Civil Engineering MCQs
Q Rate of flow of sewage is generally assumed__________________?
  • A A. More than the rate of water supply
  • B B. Equal to the rate of water supply
  • C C. Less than the rate of water supply
  • D D. At 150 litres per capita
Leave a Comment