Civil Engineering MCQs
Q In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept________________?
  • A A. 10.0
  • B B. 5.0
  • C C. 2.0
  • D D. 0.25
Leave a Comment