Civil Engineering MCQs

2965 MCQs  (Page 27 of 297)

The critical combination of stresses for corner region in cement concrete roads is____________?
A. Load stress + warping stress frictional stress
B. Load stress + warping stress + frictional stress
C. Load stress + warping stress
D. Load stress + frictional stress
The fundamental factor in the selection of pavement type is_____________?
A. Climatic condition
B. Type and intensity of traffic
C. Subgrade soil and drainage conditions
D. Availability of funds for the construction project
Maximum daily traffic capacity of bituminous pavements is______________?
A. 500 tonnes per day
B. 1000 tonnes per day
C. 1500 tonnes per day
D. 2000 tonnes per day
For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?
A. Dry rolling, wet rolling, application of screening and application of filler
B. Dry rolling, application of filler, wet rolling and application of screening
C. Dry rolling, application of screening, wet rolling and application of filler
D. Dry rolling, application of screening, application of filler and wet rolling