The knowledge of diversity factor helps in determining__________?
A. Plant capacity
B. Average load
C. Peak load
D. Kwh generated
Load shedding is possible through which of the following?
A. Switching of the loads
B. Frequency reduction
C. Voltage reduction
D. Any of the above
Which of the following plants is almost inevitably used as base load plant?
A. Diesel engine plant
B. Gas turbine plant
C. Nuclear power plant
D. Pumped storage plant
An over excited synchronous motor on no load is known as__________?
A. Synchronous condenser
B. Generator
C. Induction motor
D. Alternator
Which of the following source of power is least reliable?
A. Solar energy
B. Geothermal power
C. Wind power
D. Imhd
Which of the following is not a method for estimating depreciation charges?
A. Sinking fund method
B. Straight line method
C. Diminishing value method
D. Halsey’s 50—50 formula