Select the correct statement______________?
A. Nagpur road plan formula take into account the towns with very large population
B. Nagpur road plan has a target road length of 32 km per 100 square km
C. Second 20-year plan has provided 1600 km of expressways out of the proposed national highway
D. Second 20-year plan allowed deduction of length of railway track in the area while calculating the length of roads
The desirable length of overtaking zone as per IRC recommendation is equal to________________?
A. Overtaking sight distance
B. Two times the overtaking sight distance
C. Three times the overtaking sight distance
D. Five times the overtaking sight distance
Nagpur road plan formula were prepared by assuming______________?
A. Rectangular or block road pattern
B. Radial or star and block road pattern
C. Radial or star and circular road pattern
D. Radial or star and grid road pattern
The sequence of four stages of survey in a highway alignment is______________?
A. Reconnaissance, map study, preliminary survey and detailed survey
B. Map study, preliminary survey, reconnaissance and detailed survey
C. Map study, reconnaissance, preliminary survey and detailed survey
D. Preliminary survey, map study, reconnaissance and detailed survey
The shoulder provided along the road edge should be_______________?
A. Rougher than the traffic lanes
B. Smoother than the traffic lanes
C. Of same colour as that of the pavement
D. Of very low load bearing capacity
On a single lane road with two way traffic, the minimum stopping sight distance is equal to______________?
A. Stopping distance
B. Two times the stopping distance
C. Half the stopping distance
D. Three times the stopping distance
Camber in the road is provided for_______________?
A. Effective drainage
B. Counteracting the centrifugal force
C. Having proper sight distance
D. None of the above