All reinforcement should be free from_________________?
A. Paints
B. Loose rust
C. Loose mill scales
D. All the above
Removal of props under______________?
A. Slabs spanning upto 4.5 m is 14 days
B. Beams spanning upto 6 m is 14 days
C. Slabs spanning upto 4.5 m is 7 days
D. All the above
To ensure exact gauge, the gauge tie plates are provided at_________________?
A. Toe of the switch
B. Nose of crossing
C. Both (a) and (b)
D. None of the above
The reception signal is__________________?
I) Outer signal
Ii) home signal
Iii) starter
Iv) advanced starter
In a scissors cross-over, the crossings provided are_________________?
A. I) 2 obtuse angle crossings
B. Ii) 4 obtuse angle crossings
C. Iii) 4 acute angle crossings
D. Iv) 6 acute angle crossings
Switch angle depends on______________?
A. I) heel divergence
B. Ii) length of tongue rail
C. Iii) flangeway clearance
D. Iv) throw of switch
Study the following statements regarding creep_________________?
A. I) creep is greater on curves than on tangent railway track
B. Ii) creep in new rails is more than that in old rails
C. Iii) creep is more on steep gradients than on level track
D. The correct answer is?