The measurement is made for stone work in square metre in case of________________?
A. Wall facing
B. Columns, lintels, copings
C. Building work
D. A. and d. of the above
Anti-siphonage pipe is connected to__________________?
A. Main soil pipe
B. Bottom of p trap w.c.
C. Top of p trap w.c.
D. Side of water closet
The item of the brick structure measured in sq.m, is___________________?
A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches
According to ISI method of measurement, the order of the sequence is_________________?
A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these
The most reliable estimate is_________________?
A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate