Process layout is employed for_________________?
A. Batch production
B. Continuous type of product
C. Effective utilisation of machines
D. All of the above
Travel charts provide__________________?
A. An idea of the flow of materials at various stages
B. A compact estimate of the handling which must be done between various work sections
C. The information for changes required in rearranging material handling equipment
D. An approximate estimate of the handling which must be done at a particular station
The most important objective behind plant layout is_____________________?
A. Overall simplification, safety of integration
B. Economy in space
C. Maximum travel time in plant
D. To provide conveniently located shops
A low unit cost can be obtained by following____________________?
A. Product layout
B. Functional layout
C. Automatic material handling equipment
D. Specialisation of operation
The main disadvantage of line organisation is_________________?
A. Top level executives have to do excessive work
B. Structure is rigid
C. Communication delays occur
D. All of the above
Frederick W. Taylor introduced a system of working known as________________?
A. Line organisation
B. Line and staff organisation
C. Functional organisation
D. Effective organisation
The most popular type of organisation used for Civil Engineering Constructions is_________________?
A. Line organisation
B. Line and staff organisation
C. Functional organisation
D. Effective organisation
Queuing theory deals with problems of________________?
A. Material handling
B. Reducing the waiting time or idle jajme
C. Better utilization of MAN services
D. Effective use of machines