In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
A. Software product engineering
B. Software quality assurance
C. Software subcontract management
D. Software quality management
The CMM emphasizes____________________?
A. Continuous process improvement
B. The need to record information
C. The need to accept quality system
D. None of the mentioned
ISO 9001 is not concerned with _______________ of quality records?
A. Collection
B. Maintenance
C. Verification
D. Dis-positioning
CMM stands for_____________________?
A. Capability management module
B. Conservative maturity model
C. Capability maturity module
D. Capability maturity model
Which of the following is not included in External failure costs ?
A. Testing
B. Help line support
C. Warranty work
D. Complaint resolution
Degree to which design specifications are followed in manufacturing the product is called_________________?
A. Quality control
B. Quality of conformance
C. Quality assurance
D. None of the mentioned