Q To avoid vaporisation in the pipe line, the pipe line over the ridge is laid such that it is not more than_______________?
  • A A. 2.4 m above the hydraulic gradient
  • B B. 6.4 m above the hydraulic gradient
  • C C. 10.0 m above the hydraulic gradient
  • D D. 5.0 above the hydraulic gradient