Civil Engineering MCQs
Q The sewers___________________?
  • A A. Must be of adequate size to avoid over flow
  • B B. Must flow under gravity Β½ to ΒΎ full
  • C C. Must be laid at least 2 to 3 m deep to collect /water from the basements
  • D D. All the above
Leave a Comment