Civil Engineering MCQs
Q The rise and fall method_______________?
  • A A. Is less.accurate than height of instrument method
  • B B. Is not suitable for levelling with tilting levels
  • C C. Provides a check on the reduction of intermediate point levels
  • D D. Quicker and less tedious for large number of intermediate sights
Leave a Comment