MCQ Hive stays free thanks to ads. Please disable your ad blocker for this site so content and features keep working.
Civil Engineering MCQs
Q
The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is_________________?