Civil Engineering MCQs
Q The correct sequence of drilling equipment for increasing size of holes in tunnels is________________?
  • A A. Wagon drill, churn drill, shot drill
  • B B. Wagon drill, shot drill, churn drill
  • C C. Shot drill, churn drill, wagon drill
  • D D. Churn drill, wagon drill, shot drill
Leave a Comment