Pak Study MCQs
Q Multan Metro Bus Project Inaugurated by PM Nawaz Sharif on 24th January-2017 completed with cost of 28.88 Billions Rs. its route length is??
  • A A. 22.5 km
  • B B. 27 km
  • C C. 33.5 km
  • D D. 18.5 km
Leave a Comment