Civil Engineering MCQs
Q In “full face” method of constructing tunnels, the first operation relates to______________?
  • A A. Removal of bottom portion
  • B B. Excavation of one drift in the centre
  • C C. Removal of top portion
  • D D. Excavation being done along the periphery
Leave a Comment