Civil Engineering MCQs
Q In a grit chamber of a sewage treatment plant ____________________?
  • A A. Flow velocity 0.15 m to 0.3 m/sec is kept
  • B B. Depth of 0.9 m to 1.20 m is kept
  • C C. One minute of detention period is kept
  • D D. All the above
Leave a Comment