MCQ Hive stays free thanks to ads. Please disable your ad blocker for this site so content and features keep working.
Civil Engineering MCQs
Q
If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be________________?