Civil Engineering MCQs
Q If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________?
  • A A. 100 cm
  • B B. 90 cm
  • C C. 80 cm
  • D D. 50 cm
Leave a Comment