Civil Engineering MCQs
Q For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of___________________?
  • A A. 100 cm
  • B B. 120 cm
  • C C. 140 cm
  • D D. 160 cm
Leave a Comment