Civil Engineering MCQs
Q As compared to crest of the normal portion of the weir, the crest of the under sluice portion of weir is kept at_____________?
  • A A. Lower level
  • B B. Higher level
  • C C. Same level
  • D D. Any of the above depending on the design
Leave a Comment