Q A manufacturing firm maintains one product assembly line to produce signal generators. Weekly demand for the generators is 35 units. The line operates for 7 hours per day, 5 days per week. What is the maximum production time per unit in hours required of the line to meet the demand ?
  • A A. 1.0 hour per unit
  • B B. 1.2 hours per unit
  • C C. 1.4 hours per unit
  • D D. 1.6 hours per unit