Computer Programming MCQs

5739 MCQs  (Page 327 of 574)

CO policy in CMM means___________________?
A. The leadership practices in commitment to perform
B. The organizational structure (groups) practices in ability to perform
C. The policy practices in commitment to perform
D. The planning practices in commitment to perform
What is not included in prevention costs ?
A. Quality planning
B. Formal technical reviews
C. Test equipment
D. Equipment calibration and maintenance
The Capability Maturity Model (CMM) is a continuous model ?
A. True
B. False
ExpLanation: the cmm is discrete rather than continuous.
Which of the following is not included in failure costs ?
A. Rework
B. Repair
C. Failure mode analysis
D. None of the mentioned
Degree to which design specifications are followed in manufacturing the product is called_________________?
A. Quality control
B. Quality of conformance
C. Quality assurance
D. None of the mentioned