Which of the following equipment provides fluctuating load?
A. Exhaust fan
B. Lathe machine
C. Welding transformer
D. All of the above
Salvage value of the plant is always____________?
A. Positive
B. Negative
C. Zero
D. Any of the above
_________offers the highest electric load.
A. Television set
B. Toaster
C. Vacuum cleaner
D. Washing machine
___________ is invariably used as base load plant.
A. Diesel engine plant
B. Nuclear power plant
C. Gas turbine plant
D. Pumped storage plant
In case of _________ fuel transportation is the major problem.
A. Diesel power plants
B. Nuclear power plants
C. Hydro-electric power plants
D. Thermal power plants
Which of the following power plants need the least period for installation ?
A. Thermal power plant
B. Diesel power plant
C. Nuclear power plant
D. Hydro-electric power plant
__________ is invariably used for peak load
A. Nuclear power plant
B. Steam turbine plant
C. Pumped storage plant
D. None of the above
Which of the following is the essential requirement of peak load plant ?
A. It should run at high speed
B. It should produce high voltage
C. It should be small in size
D. It should be capable of starting quickly
By the use of which of the following power factor can be improved?
A. Phase advancers
B. Synchronous compensators
C. Static capacitors
D. Any of the above