Civil Engineering MCQs

2965 MCQs  (Page 68 of 297)

In the zone of R.C.C. beam where shear stress is less than 5 kg/cm2, nominal reinforcement is provided at a pitch of________________?
A. One -half lever arm of the section
B. One-third lever arm of the section
C. Lever arm of the section
D. One and half lever arm of the section
High strength concrete is used in pre-stressed member________________?
A. To overcome high bearing stresses developed at the ends
B. To overcome bursting stresses at the ends
C. To provide high bond stresses
D. All the above
Enlarged head of a supporting column of a flat slab is technically known as______________?
A. Supporting end of the column
B. Top of the column
C. Capital
D. Drop panel