Civil Engineering MCQs

2965 MCQs  (Page 36 of 297)

Which of the following methods of con-touring is most suitable for a hilly terrain ?
A. Direct method
B. Square method
C. Cross-sections method
D. Tacheometric method
Direct method of contouring is_________________?
A. A quick method
B. Adopted for large surveys only
C. Most accurate method
D. Suitable for hilly terrains
Benchmark is established by________________?
A. Hypsometry
B. Barometric levelling
C. Spirit levelling
D. Trigonometrical levelling
Three point problem can be solved by_________________?
A. Tracing paper method
B. Bessels method
C. Lehman’s method
D. All of the above
The type of surveying which requires least office work is________________?
A. Tacheomefry
B. Trigonometrical levelling
C. Plane table surveying
D. Theodolite surveying
Detailed plotting is generally done by________________?
A. Radiation
B. Traversing
C. Resection
D. All of the above