Civil Engineering MCQs

2965 MCQs  (Page 191 of 297)

As compared to wall type breakwater, mound type breakwater_________________?
A. Requires skilled labour
B. Requires low maintenance cost
C. Requires less material
D. Results in less damage due to gradual failure
Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area ?
A. Sea walls, bulk heads and groynes
B. Sea walls, bulk heads and revetments
C. Sea walls, revetments and groynes
D. Bulk heads, revetments and groynes